5-20 CONVERTER SYSTEM
Driven Pulley
•
Install:
Movable Sheave [A]
Spring [B]
○
Insert the spring end into the hole “C”.
NOTE
○
The fixed/movable sheave assembly has several differ-
ent spring locations which affect shifting characteristics
of the torque converter.
•
Install the ramp [A] on t he fixed sheave shaft.
○
Insert the spring end [B] into the hole “1”.
○
Fit the flat portions [C] of the ramp and shaft splines.
○
Put the spacer [A] and circlip [B] on the ramp.
○
Install the adapter [C] and tighten the flange nut until the
ramp halfway, turn the movable sheave counterclockwise
120° and hold it.
○
Push down the ramp until it is bottomed, and install the
spacer and circlip.
Special Tool - Outside Circlip Pliers: 57001-144
•
Put back movable sheave s lowly.
Driven Pulley Inspection
If the sheave surfaces [A] appear damaged, replace the
sheaves.
•
Replace any sheave which has uneven wear on the belt
contacting surface.
[B] Straight Edge
If the guide bushings [A] are damaged or worn, replace
them.
Sheave Bushing Inside Diameter
Standard:
38.075 ∼ 38.175 mm (1.499 ∼ 1.503
in.)
Service Limit: 38. 21 mm (1.5 04 in.)
Comments to this Manuals