FUEL SYSTEM 2-7
Governor Link Mechanism
Control Panel Assembly Removal
•
Remove:
Cargo Bed (raise up)
•
Drill out the pop rivets [A] holding the control panel as-
sembly shroud [B] with a drill bit of the 5 mm (0.02 in.)
diameter.
○
Drill only until the rivet head comes off. Do not drill
through the hole.
•
Remove:
Control Panel Assembly Mounting Bolts [A], Collars and
Washers
Control Panel Assembly [B]
Control Panel Assembly Installation
•
Install the governor arm [A] on the governor arm pivot [B].
•
Insert the bushings [A] in the holes of the governor arm
and throttle lever on the carburetor from upper side with
click [B].
•
Insert the link [A] in the hole of the bushings [B] from upper
side.
Comments to this Manuals