California Air Tools 3010 Service Manual Page 53

  • Download
  • Add to my manuals
  • Print
  • Page
    / 368
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 52
FUEL SYSTEM 2-7
Governor Link Mechanism
Control Panel Assembly Removal
Remove:
Cargo Bed (raise up)
Drill out the pop rivets [A] holding the control panel as-
sembly shroud [B] with a drill bit of the 5 mm (0.02 in.)
diameter.
Drill only until the rivet head comes off. Do not drill
through the hole.
Remove:
Control Panel Assembly Mounting Bolts [A], Collars and
Washers
Control Panel Assembly [B]
Control Panel Assembly Installation
Install the governor arm [A] on the governor arm pivot [B].
Insert the bushings [A] in the holes of the governor arm
and throttle lever on the carburetor from upper side with
click [B].
Insert the link [A] in the hole of the bushings [B] from upper
side.
Page view 52
1 2 ... 48 49 50 51 52 53 54 55 56 57 58 ... 367 368

Comments to this Manuals

No comments